Transportation in Kuala Lumpur

The transportation system of Kuala Lumpur is a cooperation of complex systems of infrastructure. Kuala Lumpur, being the capital of Malaysia, has an unrivaled transportation system in Malaysia, including an integrated rail network, and to a further extent, one of the longest automated driverless metro systems in the world, the Kelana Jaya Line.

Despite all the efforts to promote the usage of public transportation, the average usage of public transport in the city is only mere 16% in 2006, among the lowest in Asia.[1]

Kuala Lumpur has the country's largest airport, Kuala Lumpur International Airport, as well as South East Asia's largest intermodal transport hub, the Kuala Lumpur Sentral transportation hub.

Contents

History

Intracity Transportation

Metro or Rapid Transit

Kuala Lumpur's metro or rapid transit system consists of 6 metro lines operated by 4 operators. Among the 4 operators, RapidKL and Keretapi Tanah Melayu are the most important rail operators in Kuala Lumpur where Keretapi Tanah Melayu alone carries 30,934,651 passengers in year 2005.[2] Metro lines in Kuala Lumpur are categorized into different types: light rail transit, commuter rail, and monorail. Others such as the Intercity rail and the airport express are obviously not metro systems. It may even be argued that commuter rail services from Kuala Lumpur cannot be considered a metro system because it extends far beyond Kuala Lumpur and its immediate surroundings.

Light Rail Transit

There are two fully grade-separated light rail transit systems in Kuala Lumpur. The Kelana Jaya Line and Ampang Line. They are both operated by RapidKL.

Kelana Jaya Line is the most important rail line in Kuala Lumpur as it links Kelana Jaya and Gombak that primarily serves the Petaling Jaya region to the south; southwest and central Kuala Lumpur, and Kuala Lumpur City Centre to the centre. Todate, it carries over 170,000 passengers a day and over 350,000 a day during national events such as National Day celebration and New Year's Eve countdown celebration. At 29 km in length, the Kelana Jaya Line is the third longest fully automated driverless metro system in the world, after the SkyTrain in Greater Vancouver, Canada (49.5 km) and the Lille Metro VAL in Lille, France (32 km). In the 29 km railway line, there are 16 are elevated train stops, and 5 stops between Pasar Seni and Ampang Park are underground.

Passengers riding the rapid transit pay with stored value cards such as Touch 'n Go, which are also valid in other transit systems in Kuala Lumpur. Apart from Touch 'n Go, monthly travel pass issued by RapidKL is also accepted to pay fare.

The Ampang Line is the other rapid transit system for the two routes of the line operating in RapidKL Rail Network. These sub-lines are Ampang(formerly, Ampang line) and Sri Petaling (formerly, Sri Petaling line). These two lines are carrying over 130,000 to 150,000 per day on a weekday basis and an average of 120,000[3] per day on weekends. The Ampang Line consists of two routes totaling at a length of 27 kilometres that begin at two different stations at the south, meeting at an interchange station and ending at the same station at the north. Ampang Line has a total of 29 stations, with a combination of elevated and at-grade stations. However, there are no subways in the system.

Similarly, passengers riding the rapid transit pay with stored value cards such as Touch 'n Go and monthly travel pass issued by RapidKL to pay the fare.

Commuter Rail

Kuala Lumpur has the most extensive commuter rail system in Malaysia. Commuter rail in Kuala Lumpur is operated by two operators, which are Keretapi Tanah Melayu (English: Malayan Railways Limited) and Express Rail Link. These two operators operates 4 commuter rail lines in Kuala Lumpur, namely Sentul-Port Klang Line, Rawang-Seremban Line, Rawang-Kuala Kubu Bharu Shuttle Service and KLIA Transit. The KLIA Transit is operated by Express Rail Link whereas the remaining 3 is operated by Keretapi Tanah Melayu, which runs under a system called KTM Komuter. All 4 commuter lines integrate in KL Sentral intermodal transportation hub. The KLIA Transit commuter rail line shares the same track with KLIA Express which links Kuala Lumpur City Center and Southern Kuala Lumpur & Klang Valley.

Airport Express

The airport express service is provided by Express Rail Link, linking Kuala Lumpur City Center and Kuala Lumpur International Airport. The Airport rail link service between Kuala Lumpur and Kuala Lumpur International Airport only takes 28 minutes running at a maximum speed of 160 km/h. The train of the express service departs at 15 minute intervals during peak hours and 20 minute intervals during off-peak hours.

Monorail

Previously operated by KL Infrastructure Group, The monorail service in Kuala Lumpur serves as a people mover system for the city. It connects the Kuala Lumpur Sentral transport hub with the Golden Triangle. The system spans over 8.6 km, with 11 elevated stations, has a daily ridership of 36,000. Since November 2007, the monorail service is taken over by RapidKL, the largest public transport operator of Kuala Lumpur.[4] Passengers may have an option of paying cash or using Touch 'n Go installed in automatic fare gate to pay the ride's fare.

Buses

Kuala Lumpur bus service is rather poor compared to other cities around the world before the bus network revamp, resulting only 16% of the total population in Klang Valley use public transport.[5]

RapidKL is the largest single operator of bus network in Malaysia. Since the take over from Intrakota Komposit Sdn Bhd, RapidKL has redrawn the entire bus network of Kuala Lumpur and Klang Valley metropolitan area to increase ridership and improve Kuala Lumpur's public transportation system. The management of RapidKL has adopted the hub and spoke system to provide greater connectivity, and cutting down the need of more buses. It currently operates 177 bus routes using 849 new buses.

Bus fare charges varries with bus operator, where RapidKL buses uses daily pass system and Metrobus Nationwide, SJ Bus and Selangor Omnibus uses zoning system.

The revamp of RapidKL bus service involved redrawing all its routes and reorganising them based on the "hub and spoke" concept. Four types of bus services were created, namely express routes (EKSPRES), city shuttles (BANDAR), trunk routes (UTAMA) and local shuttles (TEMPATAN). Buses are labeled with a number and a prefix identifying different service, E for express routes, B for city shuttles, U for trunk routes and T for local shuttles. Whereas for Metrobus Nationwide buses and others, they continue using the conventional numbering system which are considered complicating.

Each area outside Kuala Lumpur city center has only one bus hub to feed passengers to city bus hubs. Whereas in Kuala Lumpur city center, there are 4 bus hubs namely KL Sentral, KLCC, Maluri and Titiwangsa. Bus hubs are usually located near public transit stations such as Kelana Jaya Line transit stations. This hub and spoke service only applies to RapidKL bus service.

Apart from RapidKL, Metrobus Nationwide is a private owned public transport company in the Klang Valley that was formed in 1992. It is the second largest stage bus and feeder bus operator in Kuala Lumpur after Rapid KL. Metrobus Natiowide owns a fleet of Nissan Diesel, Hino and Mercedez Benz buses but buses are below service standards.

Intercity Transportation

Intercity Rail

The Intercity rail is operated by Malaysia's largest railway operator Keretapi Tanah Melayu. The KTM Intercity rail network is part of the Trans-Asian Railway where it is linked to Singapore and Thailand. There are two types of KTM intercity train services namely express trains, which provide point-to-point service and mail trains. Almost all intercity trains originate from KL Sentral, whereas some originate from Gemas. Among all services, KL-Singapore route has the highest ridership, which has 466,000 in year 2005.[6]

The Intercity service serves major cities in Malaysia, as well as Singapore and Bangkok.

Kuala Lumpur - Singapore High Speed Rail

Plans are underway to construct Asia's first transnational high-speed rail system (HSR). The proposal was mooted by the Najib Razak administration is September 2010 under the Economic Transformation Programme initiative. It is envisaged to link Penang, Kuala Lumpur with Singapore.

Roads

Roads are the major arteries of Kuala Lumpur's transportation network. The road network system in Kuala Lumpur is similar to the city road network system in major Chinese cites, where it has ring roads. The main ring roads in Kuala Lumpur are Kuala Lumpur Inner Ring Road, Kuala Lumpur Middle Ring Road 1 and Kuala Lumpur Middle Ring Road 2. Roads in Kuala Lumpur are usually 3 lanes on both directions, and certain roads such as Jalan Sultan Ismail and Jalan Bukit Bintang are one way streets.[7]

Expressways

Expressways in Kuala Lumpur are tolled roads. They serve as an alternative during peak periods at which time some parts of Kuala Lumpur's ring roads become highly congested. Kuala Lumpur is well connected by many intracity expressways such as the Ampang-Kuala Lumpur Elevated Highway. Moreover, Kuala Lumpur is the home for the world's first[8] SMART Tunnel, which is a unique solution to Kuala Lumpur's long-term traffic problems and floodwater mitigation woes.

Most expressways in Kuala Lumpur adopt a open toll collection system. NKVE is the only closed toll system in Klang Valley. In the open toll system, the user pays the toll at each toll plaza, while for the closed toll system, the tolls are to be paid at the toll plazas when exiting the expressway. Payment options includes cash, stored value card Touch 'n Go or electronic toll collection system SmartTAG.

Access from the city to the surrounding areas are facilitated by a series of expressways which is both integrated and complex. From the city center to the south-western areas, access is provided mainly from Federal Highway which connects the city to Klang and bridging Petaling Jaya, Subang Jaya, Kelana Jaya and Shah Alam. New Pantai Expressway provides an alternative route to Subang Jaya, bypassing the morning and evening traffic jams on the Federal Highway. An alternative connection to Shah Alam, Subang Jaya and Klang is provided by New Klang Valley Expressway which connects with Sprint Expressway. This connects the city center to Damansara, west of the city center. The New Klang Valley Expressway also provides connections to Sungai Buloh and Kepong, and is linked to the northern section of the North-South Expressway, which provides access to northern states like Perak, Penang and Kedah. Connection from Damansara in the northwest to Puchong in the south-west of Kuala Lumpur is facilitated by Damansara-Puchong Expressway, which also provides connection to Putrajaya.

Access from the city center to southern areas is provided by Sungai Besi Expressway, which leads to the Bukit Jalil and Sungai Besi areas. The highway runs in parallel with the Kuala Lumpur-Seremban Expressway. The highway also provides an alternative route to Kajang by connecting with Kajang Dispersal Link Expressway.

Access from the city center to south-eastern areas is provided by Cheras Highway which connects to Cheras. The highway is connected with Cheras - Kajang Expressway, which provides access to Kajang and that highway itself is connected with Kajang-Seremban Highway and Kajang Dispersal Link Expressway, giving alternative access to Seremban and southern parts of the city.

Connection from the city center to eastern areas is provided by Ampang-Kuala Lumpur Elevated Highway. The highway is connected to Kuala Lumpur Middle Ring Road 2 for access to Batu Caves and Gombak. In close proximity with Karak Expressway, it provides access to the east coast area of Malaysia. There is no dedicated highway leading from the city center to the northern areas such as Batu Caves, however, Jalan Kuching is the main road from the city to the northern area.

The MMR2 connects with KESAS Highway which provides yet another alternative route to Shah Alam and Subang Jaya. The KESAS highway also has connections to Kuala Lumpur-Seremban Expressway which integrates with the southern section of North-South Expressway and North-South Expressway Central Link which provide access to Kuala Lumpur International Airport.

Connection from the city to Putrajaya is facilitated by a direct highway, Kuala Lumpur-Putrajaya Expressway which also provide connections to Kuala Lumpur International Airport through North-South Expressway Central Link. The highway also provides alternative access to southern areas of the city such as Puchong and Bukit Jalil.

Below is a non-exhaustive list of expressway serving the Klang Valley area:-

Expressway Name Areas Served Linkage to other Expressways
Federal Highway Klang, Petaling Jaya, Subang Jaya, Kelana Jaya and Shah Alam New Pantai Expressway, Sprint Expressway
SMART Tunnel Jalan Sultan Ismail, Jalan Tun Razak Federal Highway, Kuala Lumpur-Seremban Expressway, Cheras Highway
New Pantai Expressway Subang Jaya Federal Highway, Kuala Lumpur-Seremban Expressway
Sprint Expressway Damansara, Taman Duta New Klang Valley Expressway, Federal Highway
New Klang Valley Expressway Subang Jaya, Klang, Damansara North-South Expressway, North-South Expressway Central Link, Sprint Expressway
North-South Expressway Central Link Putrajaya, Cyberjaya, Kuala Lumpur International Airport, Saujana Putra, Shah Alam, Nilai New Klang Valley Expressway, North-South Expressway
Kuala Lumpur-Seremban Expressway Kuala Lumpur, Seremban, Kajang, Bangi, Nilai North-South Expressway Central Link, North-South Expressway, SMART Tunnel, Kuala Lumpur-Putrajaya Expressway
Kuala Lumpur-Putrajaya Expressway Putrajaya, Cyberjaya Kuala Lumpur-Seremban Expressway, KESAS Highway
KESAS Highway Shah Alam, USJ, Klang, Kota Kumuning, Bukit Jalil, Sri Petaling Kuala Lumpur-Putrajaya Expressway, Kuala Lumpur-Seremban Expressway
Sungai Besi Expressway Sungai Besi, Bandar Tasik Selatan Kajang Dispersal Link Expressway, North-South Expressway
Kajang Dispersal Link Expressway Kajang, Cheras, Sungai Long South Klang Valley Expressway, Cheras - Kajang Expressway, Sungai Besi Expressway
Duta-Ulu Klang Expressway Taman Duta, Ulu Klang, Gombak New Klang Valley Expressway, Kuala Lumpur-Rawang Highway, Kuala Lumpur Middle Ring Road 2, Karak Expressway
Cheras Highway Cheras, Sungai Besi | Cheras - Kajang Expressway, Kuala Lumpur Middle Ring Road 1, Kuala Lumpur Middle Ring Road 2, Salak Expressway
Cheras - Kajang Expressway Cheras, Kajang Cheras Highway, Kajang-Seremban Highway, Kajang Dispersal Link Expressway, SMART Tunnel
Kajang Dispersal Link Expressway Kajang City Center Cheras Highway, Kajang-Seremban Highway
Kajang-Seremban Highway Kajang, Semenyih, Seremban Cheras - Kajang Expressway, Cheras Highway
Salak Expressway Taman Coughnaut, Sungai Besi Cheras Highway, Cheras - Kajang Expressway, Kuala Lumpur-Seremban Expressway, SMART Tunnel

Taxis

Metered taxis or 'Teksi Bermeter' in Malay can be hailed throughout the city. However, traffic jams, especially during rush hour are fairly common in KL and it might be difficult to get a taxi during rush hour. There have been many incidents of taxi drivers charging extravagant fares, especially among tourists, therefore, tourists are advised to travel with taxis who charge fare according to meters, or insist on using the meter.

Taxi stands are available around the city and most taxis will stop at the taxi stand. Taxis in Kuala Lumpur are coloured in various colors such as a combination of red-white, red, yellow-blue, green or yellow. However, taxis could be easily recognized as the taxis' vehicle registration number carries a prefix H or LIMO for airport limousine.

Intermodal transportation hub

There are various intermodal transportation hubs in Kuala Lumpur, with one major intermodal transportation hub in the city center of Kuala Lumpur, the Kuala Lumpur Sentral transportation hub.

Kuala Lumpur Sentral

Kuala Lumpur Sentral (KL Sentral) or Sentral Kuala Lumpur is a transit-oriented development that houses the main railway station of Kuala Lumpur, which has officially taken over the role of Kuala Lumpur Railway Station. It is the largest train station in South East Asia.

Stesen Sentral is designated the transportation hub within its KL Sentral development project, although both the public and connected transit lines generally refer to the station itself as "KL Sentral". Among rail lines in Kuala Lumpur, Kelana Jaya Line, KL Monorail, KTM Komuter, KTM Intercity, KLIA Ekspres and KLIA Transit integrate in this station.

Located within Stesen Sentral, the KL City Air Terminal (KL CAT) is virtually an extension of the Kuala Lumpur International Airport. KL CAT also has luggage check-in services. Currently, only passengers flying Malaysia Airlines, Cathay Pacific, Emirates and Royal Brunei Airlines can check in their luggage at KL CAT. KL Sentral has also been made a city bus hub by RapidKL under its bus network revamp. It is the bus hub for city shuttle bus (BANDAR) and trunk routes(UTAMA). Furthermore, some buses departing to Kuala Lumpur International Airport's Low Cost Carrier Terminal also originate from KL Sentral.

Stesen Sentral will be able to accommodate 50 million passengers a year and up to 100 million by 2020.

Puduraya

Puduraya is the main bus terminus for Kuala Lumpur. Long-distance buses arrive and leave from Puduraya for all over Malaysia. Under Kuala Lumpur 2020 Structural Plan, there are plans to move some bus operators to inter-regional hubs in other parts of Kuala Lumpur such as Perhentian Duta, Gombak Hub and Bandar Tasik Selatan hub to avoid massive congestion in Puduraya.[9]

Puduraya is accessible via Ampang Line, at Plaza Rakyat Station

Port Infrastructure

Airports

Kuala Lumpur is the main gateway for Malaysia as it has the country biggest airport, Kuala Lumpur International Airport, about 25 million passengers used the airport, making it the busiest airport in Malaysia.[10]

The city is served by 2 airports, which is Kuala Lumpur International Airport and Sultan Abdul Aziz Shah Airport(formerly. Subang International Airport). Both airports have international connections, but Sultan Abdul Aziz Shah Airport is solely for turboprop aircraft and private jets only.[11] Kuala Lumpur International Airport apart from being the main passenger gateway, it is also the main cargo destination in Malaysia by cargo traffic.[10] Kuala Lumpur International Airport is linked to the city center by KLIA Express by rail, major expressways and bus service. Whereas Subang Airport is well connected by road networks and bus service.

Kuala Lumpur International Airport (KLIA) is capable of handling 35 million passengers and 1.2 million tonnes of cargo a year in its current phase. It is currently ranked as the 13th busiest airport in the world by international passenger traffic where it has handled 24,129,748 passengers in the year of 2006. In the same year, it is also ranked 30th busiest airport in the world by cargo traffic where it has handled 677 446 metric tonnes of cargo.[12] Kuala Lumpur International Airport is one of the only few airports in East Asia to have links to South America, where Malaysia Airlines, has flights out of Kuala Lumpur International Airport to Buenos Aires via Johannesburg and Cape Town.

Both airports are operated by Malaysia Airports and is the hub for Malaysia Airlines, Malaysia Airlines Cargo, AirAsia, and AirAsia X in Kuala Lumpur International Airport and Firefly, Transmile Air Services and Berjaya Air in Subang Airport. Moreover, KLIA is also the stopover point for the kangaroo route for Malaysia Airlines.

Seaports

Port Klang is one of the main ports of Malaysia, located in the district of Klang in the state of Selangor. It serves the Klang Valley, including the federal capital Kuala Lumpur and federal administrative capital Putrajaya.

Port Klang was originally known as Port Swettenham when it was founded under British colonial rule in 1893, after the then British Resident High Commissioner for the Malay State, Sir Frank Swettenham. Official opening of the port was on September 15, 1901, which developed as a new port after a study found that its coastal area had a harbor with deep anchorage, free from dangers and very suitable for wharves. Its development was accelerated further with the extension of a railway line from Kuala Lumpur to the new port. The Port Klang Authority, established 1 July 1963, administers the three ports in the Port Klang area: Northport, Southpoint and West Port. As of November 2007, West Port, part of the three ports in Port Klang, has handled 4 million twenty-foot equivalent units (TEU) worth of containerized cargo, and is moving towards its 4.3 millionth TEU by end of 2007. Together with North port and South port, Port Klang handled 7.12 million TEU of containerized cargo and 133.5 million tonnes of conventional cargo in 2007.[13]

Apart from cargo ships, Port Klang also features a cruise ship terminal in Westport where SuperStar Virgo and Queen Mary 2,[14] the world's second largest passenger ship has docked in the terminal for excursion. Port Klang is also the home port of call for SuperStar Gemini.

Port Klang has its own free zone, called Port Klang Free Zone (PKFZ). It is an integrated 1,000-acre (4.0 km2) international cargo distribution and consolidation centre situated in Port Klang, the world’s 13th ranked port in 2005 in terms of throughput volume.[15] The PKFZ is designed to promote entreport trade and manufacturing industries involved in producing goods primarily for export. In 2007, PKFZ Authority has secured USD 220 million and projected to secure another USD 184 million[16] in 2008. The project is similar to Dubai's Jebel Ali Free Zone, which previously PKFZ is managed by Jebel Ali Free Zone Authority (JAFZA).

Port Klang is well connected by road and rail networks. On rail, Port Klang is connected by Keretapi Tanah Melayu, whereas by road, Port Klang is connected by Federal Highway and Shah Alam Expressway

Future Projects

Plaza Rakyat

Plaza Rakyat is a mixed used skyscraper complex initiated during the 1990s that was to be completed but was halted due to the 1997 Asian Financial Crisis. The building was intended to replace Puduraya bus depot and also to provide better connectivity to Ampang Line's Plaza Rakyat LRT station. It was recently announced that the project has been revived and will be completed in 2012.

LRT line extension and expansion

On 29 August 2006, Malaysian Deputy Prime Minister Mohd Najib Abdul Razak announced an RM10 billion plan to expand Kuala Lumpur's public transport network. The plan included extending the existing Kelana Jaya Line from Kelana Jaya to USJ and the Ampang Line from Sri Petaling to Puchong and USJ. The plan also will see a new light rail transit line being constructed between Kota Damansara to the northwest of Kuala Lumpur and Cheras which lies to the southeast of Kuala Lumpur. No details of the alignment of the extensions nor the locations of new stations were revealed.[17]

The Star, a local newspaper reported a new 40 km route from Cheras to Kota Damansara which traverse the city center through Bangsar, KL Sentral, Pasar Seni and Masjid Jamek stations. The new line is expected to be ready by 2012, however, as of July 2008, no construction has started.[18]

Sentul-Batu Caves KTM Komuter expansion

A 7.2 km (4.5 mi), four-station extension from the Sentul station to Batu Caves has been approved. The project - which will cost RM515 million - will include electrification, double-tracking and refitting the existing old track, signalling, communications, as well as construction of new stations at Sentul, Batu Cantonment, Batu Village, Taman Wahyu and Batu Caves. Site possession was given to contractor YTL Corporation Berhad on November 17, 2006, and the project is to be completed in 30 months' time in May 2009. The Sentul station is part of the Sentul Raya masterplan development under YTL.[19]

Multi Lane Free Flow

By 2008, expressways in Kuala Lumpur will introduce Multi Lane Free Flow system similar to SmartTAG. Under the Multi Lane Free Flow, which is similar to system used extensively in Europe, the United States, Australia, Canada and Singapore, the toll changes will be deducted electronically as vehicles beating special tags pass through too plazas a normal driving speeds as fast as 180 km/h, as there will be no barriers.[20] Trails of the system is expected to be run starting November 2008 with the Sungai Pencala Toll Plaza on the Damansara-Puchong Expressway(LDP) as the test site.[21] Shah Alam toll plaza as also been selected as a new test site for the system beginning December 2008.[22]|This system will implement in 2010 by stages

Outer Ring Railway Service

Currently in proposal phase as of April 2008, KTM propose a railway link to connect all suburbs in the Klang Valley. The 70 km line will be a circular loop and expected to link Sentul, Kepong, Sungai Buloh, Kelana Jaya, Shah Alam, Cheras and Bandar Tasik Selatan without going through the city center.[23]

Bandar Tasik Selatan Integrated Transport Hub

The Bandar Tasik Selatan station will be upgraded to an integrated transport hub. It is expected to serve buses coming from the south of Kuala Lumpur. Construction has started since November 2007 and expected to complete by 2010.[24] Currently, the station serves Ampang Line, Rawang-Seremban Route of the KTM Komuter and KLIA Ekspres line.

References

  1. ^ "Prasarana to buy trains worth RM1.2bil". The Star. 2006-10-13. http://besonline.rtm.net.my/modules.php?op=modload&name=News&file=article&sid=65671. Retrieved 2006-10-22. 
  2. ^ KTMB Statistics on ridership
  3. ^ Amapng Line Ridership
  4. ^ Prasarana new operator of KL Monorail
  5. ^ "Prasarana to buy trains worth RM1.2bil". The Star. 2006-10-13. http://besonline.rtm.net.my/modules.php?op=modload&name=News&file=article&sid=65671. Retrieved 2006-10-22. 
  6. ^ KTMB Intercity Statistics
  7. ^ One Way Streets in Golden Triangle
  8. ^ World First Dual Purpose Road Tunnel opens
  9. ^ KL 202 Structural Plan
  10. ^ a b Malaysia Airports 2006 Air Statistics
  11. ^ Subang Airport for Turboprops only
  12. ^ Airport Traffic
  13. ^ Port Klang expects to handle 7.74m TEU this year
  14. ^ QM2 Sails into Port Klang
  15. ^ Port Klang Free Zone
  16. ^ Two more new investors for PKFZ
  17. ^ Mergawati Zulfakar (30 August 2006). "Rail travel expansion". The Star. http://www.thestar.com.my/news/story.asp?file=/2006/8/30/nation/15276661&sec=nation&focus=1. Retrieved 2007-06-22. 
  18. ^ Leong Shen-Li (2008-06-15). "Kota Damansara-Cheras rail line right on track". The Star. http://thestar.com.my/news/story.asp?file=/2008/6/15/nation/21558681&sec=nation. Retrieved 2008-07-05. 
  19. ^ "Landasan Berkembar Elektrik Sentul-Batu Caves (Sentul-Batu Caves double tracking and electrification)". Archived from the original on 2007-09-27. http://web.archive.org/web/20070927062032/http://www.ktmb.com.my/article.asp?id=1995. Retrieved 2007-06-14. 
  20. ^ "Works Department of Malaysia to introduce Multi Lane Free Flow in Kuala Lumpur". Ministry of Works Malaysia. http://portal.kkr.gov.my/kkrportal/kkrportal;jsessionid=28F5D32C42C84A6F17EBAD462B30F099?gs_action=doViewKkrInMedia&ZlH_kkrInMediaId=ff808081112f0b2301112f93112800d3&up=ZlH&cid=content. Retrieved 2007-03-08. 
  21. ^ "‘No stop’ toll trials to begin in November". The Star. 2008-07-22. http://thestar.com.my/news/story.asp?file=/2008/7/22/nation/21882113&sec=nation. Retrieved 2008-07-22. 
  22. ^ "Booth-free trial run at Batu Tiga". New Straits Times. http://www.nst.com.my/Current_News/Streets/Wednesday/Stories/2393189/Article/. 
  23. ^ "Commuter line for suburbs". The Star. http://thestar.com.my/news/story.asp?file=/2008/4/18/nation/20987183&sec=nation. Retrieved 2008-04-17. 
  24. ^ "RM570mil terminal project to proceed". The Star. 2008-07-08. http://thestar.com.my/news/story.asp?file=/2008/7/8/parliament/21760203&sec=parliament. Retrieved 2008-07-08. 

See also